Electrical Costing (Per Sq.foot) Quick Reference
ELECTRICAL COSTING (PER SQ.FT) QUICK REFERENCE
LOAD IN MULTI-STORIED BUILDING (MADHYANCHAL VIDYUT VITRAN NIGAM)
Type of Load
Calculation
Diversity
Domestic (Without Common Area)
50 watt / sq. meters
0.5
Commercial (Without Common Area) 150 watt / sq. meters
0.75
Lift, Water Pump, Streetlight ,Campus Lighting ,Common Facilities,
Actual load shall be calculated
0.75
LOAD IN MULTI-STORIED BUILDING (NOIDA POWER COMPANY LIMITED)
Type of Load
Calculation
Diversity
Domestic (Constructed area) 15 watt / sq. Foot
0.4
Commercial(Constructed area) 30 watt / sq. Foot
0.8
Industrial (Constructed area) 100 watt/ 1 sq. Foot
0.5
Lift, Water Pump, Streetlight ,Campus Lighting ,Common Facilities, 0.5Kw / Flat
Voltage Drop: 2% Voltage drop from Transformer to Consumer end.
T&D Losses: 2% T&D Losses from Transformer to Consumer end.
APPROXIMATE % COST OR SQ.FOOT COST
Project Item
% of Total Project Cost
Rs per Sq.Foot
Articheture (Consultancy)
0.7%
13.1 Rs / Sq.Foot
Structural (Consultancy)
1.2%
21.8 Rs / Sq.Foot
Service Design (Consultancy)
0.4%
7.2 Rs / Sq.Foot
Fire Fighting Work
1.3%
23 Rs / Sq.Foot
Electrical Work (Internal)
4.1%
76 Rs / Sq.Foot
Lift Work
4.4%
82 Rs / Sq.Foot
STREET LIGHT COSTING (CPWD-2012)
Fluorescent Lamp
95 Rs/Sq.Meter
With HPMV Lamp
130 Rs/Sq.Meter
With HPSV Lamp
165 Rs/Sq.Meter
Electrical Sinage
85 Rs/Sq.Meter
OTHER ELECTRICAL COST
Area Required for Solar Light
10 Watt/Sq.Foot
Solar Power Installation
1.5 Lacs Rs/1Kw
HVAC Cost
18 Watt/Sq.Foot
DISTRIBUTION LOSSES (GUJARAT ELECTRICITY BOARD)
Voltage (Point of Injection)
At 11 KV
Point of Energy Delivered
11KV / 22KV / 33KV
10%
10.82%
400 Volt
–
16.77%
SIZE OF VENTILATION SHAFT:
Height of Building in meter Size of ventilation shaft in sq meter Minimum size of shaft in meter
9.0
1.5
1.0
12.5
3.0
1.2
15 and above
4.0
1.5
RATE ANALYSIS (CPWD-2012)
Description
Amount Sub Station Equipment 7000 Rs/ KVA D.G Set with installation 1000 Rs / KVA UPS with 30min Breakup 20000 Rs / KVA add 8000 Rs / KVA additional each 30 min Solar Power Generation 1.25 Lacs / KW Solar Water System (200Liter/Day) 46000 Rs Solar Water System (300Liter/Day) 64000 Rs Solar Water System (1000Liter/Day) 210000 Rs Central AC Plant 75000 RS / Ton VRF / VRV System 55000 Rs / HP Air condition System 11000 Rs / Ton CCTV System 300 Rs / Sq Meter Access Control system 200 Rs / Sq Meter Hydropenumatic Water system 2000 Rs / LPM Building Management System 300 Rs / Sq Meter add 100 Rs / Sq Meter additional area beyond 10000 Sq Meter
RATE ANALYSIS (RS PER SQ. METER) (CPWD-2012)
Work
Office/College/Hospital
School
Hostel
Residence
Fire Fighting (with Wet Riser)
500
500
500
500
Fire Fighting (with Sprinkler)
750
750
750
750
Fire Alarm (Manually)
–
–
–
300
Fire Alarm (Automatic)
500
500
500
500
Pressurized Mechanical Ventilation
650
650
650
650
RATE ANALYSIS (% OF TOTAL PROJECT COST) (CPWD-2012)
Work
Office/College/Hospital
School
Hostel
Residence
Internal Water Supply & Sanitary
4%
10%
5%
12%
Internal Electrical Installation
12.5%
12.5% 12.5% 12.5%
LIFT SPEED (INDIAN ARMY MANUAL)
No of Floor
Lift Speed
4 to 5
0.5 to 0.7 meter/Sec
6 to 12
0.75 to 1.5 meter/Sec
3 to 20
1.5 to 2.5 meter/Sec
Above 20
Above 2.5 meter/Sec
LIFT DETAILS (CPWD-2012)
Type of Lift
Persons
Weight
Speed M/Sec
Travel
Price
Add Rs /Floor
Passenger Lift
8 Person 544 Kg 1.0 G+4 18 Lacs 1.25 Lacs
Passenger Lift
13 Person 844 Kg 1.5 G+4 22 Lacs 1.25 Lacs
Passenger Lift
16 Person 1088 Kg 1.0 G+4 28 Lacs 1.50 Lacs
Passenger Lift
20 Person 1360 Kg 1.5 G+4 30 Lacs 1.50 Lacs
APPROXIMATE LOAD AS PER SQ.FT AREA (AS PER DHBVN):
Sq.ft Area Required Load (Connected) < 900 Sq.ft 8 KW 901 Sq.ft to 1600 Sq.ft 16 KW 1601 Sq.ft to 2500 Sq.ft 20 KW > 2500 Sq.ft 24 KW For Flats :100 Sq.ft / 1 KW For Flats USS /TC: 100 Sq.ft / 23 KVA
LOAD AS PER SQ.FT:
Type of Load
Load/Sq.Ft
Diversity Factor
Industrial
1000 Watt/Sq.Ft
0.5
Commercial
30 Watt/Sq.Ft
0.8
Domestic
15 Watt/Sq.Ft
0.4
Lighting
15 Watt/Sq.Ft
0.8
CONTRACTED LOAD IN CASE OF HIGH-RISE BUILDING:
For Domestic Load 500 watt per 100 Sq. foot of the constructed area. For Commercial 1500 watt per 100 Sq. foot of the constructed area Other Common Load For lift, water lifting pump, streetlight if any, corridor/campus lighting and other common facilities, actual load shall be calculated Staircase Light 11KW/Flat Ex: 200Flat=200×11=2.2KW
Sanctioned Load for Building
Up to 50 kW The L.T. existing mains shall be strengthened. 50 kW to 450 kW (500 kVA) 11 kV existing feeders shall be extended if spare capacity is available otherwise, new 11 kV feeders shall be constructed. 450 kW to 2550 kW (3000 kVA) 11 kV feeder shall be constructed from the nearest 33 kV or 110 kV substation 2550 kW to 8500 kW (10,000 kVA) 33kV feeder from…